The work continues. The Buddha Halls are basically done except for painting and installing the floor, although the new windows and front door still need to be added. They have been ordered and should be here in a couple of weeks. It was decided to replace the entire façade of the building with stucco to match the rest of the temple. The electrician has been busy bringing the existing wiring up to code and installing the changes for the temple. ...
Continue Reading →APR
2015