Work Continues on Temple

The red and gold paints transform the Buddha Halls. The door into the bathroom at the rear will be relocated to the outside wall when the new addition is added. The sewer lines and drainage pipes shown below have been set and the foundation footers are in place for the new bathroom addition. The door will be cut into the existing bath where there is currently a window shown and another door will be added to the left of that door to ...

Continue Reading →
0