Floor and Front Door in Place

Others came to work as the work retreat continued.

Floor and front door installed in Buddha Hall.

Floor and front door installed in Buddha Hall.

Thangkas of Dharmapalas back in place.

Thangkas of Dharmapalas back in place.

Installing the front door.

Charley’s crew install the front door.

Front door detail.

Front door detail

Uma makes short work of the weeds.

Uma makes short work of the weeds.

Palm tree gets trimmed.

Palm tree gets trimmed.

0
  Related Posts
  • No related posts found.